CCN Technical Operations

Integrated Technical Infrastructure Management

At CCN, we provide integrated technical facility services with a strong engineering discipline at large-scale city hospitals developed under the Public-Private Partnership (PPP) model. In Türkiye’s largest healthcare investments, such as Ankara Bilkent City Hospital and Mersin City Education and Research Hospital, we carry out building and land management, maintenance and repair, common area management, and environmental maintenance services through digitally traceable infrastructure that ensures uninterrupted and sustainable operations.

Our Success Story <br>in Numbers

INTEGRATED HEALTHCARE FACILITY MANAGEMENT
284.600+
Equipment Managed (21 Buildings, 2 Campuses)
INTEGRATED TECHNICAL OPERATIONS
627.800+
Annual Maintenance Operations (1,774,667 m² Area)
TECHNICAL STAFF
392
Specialized Technical Personnel
ISTANBUL FINANCIAL CENTER (IFC)
1.785.000 m²
Area Operated (14 Blocks, 1 Shopping Mall)
IFC TECHNICAL OPERATIONS
27.700+
Annual Maintenance Operations and Management of 96 Automation Systems
IFC SPECIALIZED STAFF
140
Specialized Personnel (24/7 Uninterrupted Operations)
INTEGRATED TECHNICAL PROJECTS
123
Technical Employees (4 Locations, 4 Projects)

Expertise and Scale in Technical Operations

We draw our strength from our specialized engineering and technical teams,continuously updatedtraining programs, strong budget and business planning capabilities, calibration processes, and advanced data analytics supported by our corporate software infrastructure. Under Integrated Facility Management, a total of 284,622 pieces of equipment are managed across hospitals, while 627,850 maintenance operations are carried out annually in a planned and systematic manner. Our 392-member technical staff carries out integrated technical operations across 21 buildings and 2 campuses covering a total area of 1,774,667 m².

 

Within the scope of the Türkiye Wealth Fund Istanbul Financial Center (IFC) Project, our specialized staff of 140 carries out maintenance, repair, post-construction maintenance, and operational activities on an uninterrupted 24/7 basis across a total area of 1,785,000 m² comprising 14 blocks and 1 shopping mall. As part of the operation, 27,784 periodic maintenance operations are carried out annually, while the periodic maintenance processes for 96 automation systems are managed through a planned, systematic, and sustainable approach.

Digital Control Infrastructure

We monitor all these systems centrally through the Building Management System (BMS), using real-time data to enable preventive maintenance, pre-fault intervention, and performance optimization. This approach enables technical processes to be managed not only without interruption, but also in a predictable and sustainable manner.